The following reports are being undertaken by private sector consultants under the guidance
of the Steering Committee:
|
 |
Environmental Impact Assessment Issues Scoping Report
|
Includes discovery and definition of environmental issues to be addressed under the
preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 14 MB)
Avg. Download Time: Cable/DSL=2.4 min. | 56k=18.4 min.
|
 |
Environmental Scoping Meetings First Nations Report
|
Includes discovery and definition of First Nations issues to be addressed under the preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 544 kB)
Avg. Download Time: Cable/DSL=6 sec. | 56k=40 sec.
|
 |
Environmental Scoping Meetings Métis Report
|
Includes discovery and definition of Métis issues to be addressed under the preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 538 kB)
Avg. Download Time: Cable/DSL=5.5 sec. | 56k=44 sec.
|
 |
Dam Safety Report
|
Includes assessment of the condition and capacity of the works in accordance with
Canadian Dam Association guidelines.
A draft copy of this report will be posted in the fall of 2007.
|
 |
Preliminary Engineering Report
|
Includes assessment of future water demands along the Assiniboine River and preliminary study of works to meet future demands (Shellmouth and other options).
A draft copy of this report will be posted in the fall of 2007.
|
 |
Assessment of Downstream Agricultural Damages Report
|
Includes the assessment of the impact of the operation of Shellmouth Dam on agricultural production in the valley downstream of the Shellmouth Dam.
A draft copy of this report will be posted in the fall of 2007.
|
 |
Environmental Assessment Report
|
Includes assessment of environmental impacts (air, water, land, socio-economic) and recommendations for mitigation where necessary.
A draft copy of this report will be posted in the fall of 2007.
|