Canada-Manitoba Shellmouth Dam Consolidation Agreement
About Shellmouth Dam & Agreement Objectives
Shellmouth Dam Consolidation Agreement
Federal-Provincial Management Committee
Press Release | Question & Answer
Download: Presentations
Download: Reports
Meetings
Project Status

All reports are published in the Portable Document Format (pdf). Adobe Acrobat Reader is required to view these reports. If you do not have Adobe Reader installed, click here.

To download a report, right-click on the PDF hyperlink and select "Save Target As..."


Assiniboine River Flow Enhancement

Shellmouth Reservoir Water Supply Study circa 1992
View: PDF (Approximate File Size = 13.5 MB)
Avg. Download Time: Cable/DSL=2.3 min. | 56k=18 min.

The following reports are being undertaken by private sector consultants under the guidance of the Steering Committee:

Environmental Impact Assessment Issues Scoping Report

Includes discovery and definition of environmental issues to be addressed under the preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 14 MB)
Avg. Download Time: Cable/DSL=2.4 min. | 56k=18.4 min.

Environmental Scoping Meetings First Nations Report

Includes discovery and definition of First Nations issues to be addressed under the preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 544 kB)
Avg. Download Time: Cable/DSL=6 sec. | 56k=40 sec.

Environmental Scoping Meetings Métis Report

Includes discovery and definition of Métis issues to be addressed under the preliminary engineering and environmental assessment reports.
View: PDF (Approximate File Size = 538 kB)
Avg. Download Time: Cable/DSL=5.5 sec. | 56k=44 sec.

Dam Safety Report

Includes assessment of the condition and capacity of the works in accordance with Canadian Dam Association guidelines.
A draft copy of this report will be posted in the fall of 2007.

Preliminary Engineering Report

Includes assessment of future water demands along the Assiniboine River and preliminary study of works to meet future demands (Shellmouth and other options).
A draft copy of this report will be posted in the fall of 2007.

Assessment of Downstream Agricultural Damages Report

Includes the assessment of the impact of the operation of Shellmouth Dam on agricultural production in the valley downstream of the Shellmouth Dam.
A draft copy of this report will be posted in the fall of 2007.

Environmental Assessment Report

Includes assessment of environmental impacts (air, water, land, socio-economic) and recommendations for mitigation where necessary.
A draft copy of this report will be posted in the fall of 2007.

Download: Maps
Download: Layout & Location Plan
Related Links
Info & Inquiries